Process Number: 13 |
Revision Date: 4/22/2013 5:38:00 PM |
Revision #: 2 |
Confirm that Credit Card Operation is Functioning
**PROCESS OBSOLETE**
Office Responsible: | DCS - District - Computing Services | Process Type: | internal |
Position Title: | Systems Analyst | Author: | DTurnbeau | ||
Cross Trained Staff: | MMooney | Manager: | DHarris | Vice Pres.: | RTemple |
Timeline (Deadlines or Time-Constraints) : |
Upon Arrival - Daily |
What must be done before this process is started: |
IC Verify must be opened |
Which processes are waiting for this process: |
Registration/Accounts Receivable |
Source documents or communication with information needed for this process: |
What is the end-result of this process, or the hand-off |
Confirmation that the credit card processing system for accounts receivable is up and functioning. |
What steps must be taken independent of the computer system (Manual Process) |
Locate the switch box for EPOS1/EPOS2/Skywalker/LearnOnLine in the computer room. |
Which steps must be taken on a computer (Electronic Process): |
1. On switch box, click port selection until the green light is highlighted on EPOS 1. 2. In the lower right-hand corner, click on ICVerify Multi-User Request File Processor. 3. Examine the box in the upper left-hand corner that says "initialize". - If this box (the word initialize) is dimmed, then the credit card system is up and functional. At this point, simply minimize IC Verify. - If this box (the word initialize) is bolded, then click on the word "initialize" and the system will start-up the credit card process. To end, minimize IC Verify. |
Related Documents to Process (e.g. Datatel documentation, Government code books, etc.) |
Notes (Cautions, suggestions for improvement, etc.) |
Process Number: 13 |
Revision Date: 4/22/2013 5:38:00 PM |
Revision #: 2 |