|
Process Number: 28 |
Revision Date: 2/21/2001 1:47:00 PM |
| Revision #: 1 |
S02.EXCEPTION.RPT
| Office Responsible: | DCS - District - Computing Services | Process Type: | internal |
| Position Title: | Programmer | Author: | CGreen | ||
| Cross Trained Staff: | Manager: | Vice Pres.: | RTemple | ||
| Timeline (Deadlines or Time-Constraints) : |
| What must be done before this process is started: |
| Which processes are waiting for this process: |
| Source documents or communication with information needed for this process: |
| What is the end-result of this process, or the hand-off |
| A report is produced that includes the instructor`s Name, ID#, Contract Type (C = Oontract, H = Hourly), the instructor`s regular load, over load and other load for the primary college and secondary college. An instructor must have at least a 0.6 load for any one of the load types. |
| What steps must be taken independent of the computer system (Manual Process) |
| Which steps must be taken on a computer (Electronic Process): |
| 1. The mnemonic for the program is XFLE. 2. The menu path is: a. ST - Student System b. 13 - Faculty Information - FI c. 43 - SBCCD Faculty Reports - XFIR d. 4 - Faculty Load Exception Report - XFLE 3. The parameters are, Primary location, term, Division (A for all divisions) and contract type. |
| Related Documents to Process (e.g. Datatel documentation, Government code books, etc.) |
| Notes (Cautions, suggestions for improvement, etc.) |
|
Process Number: 28 |
Revision Date: 2/21/2001 1:47:00 PM |
| Revision #: 1 |