Timeline (Deadlines or Time-Constraints) : |
|
What must be done before this process is started: |
|
Which processes are waiting for this process: |
|
Source documents or communication with information needed for this process: |
|
What is the end-result of this process, or the hand-off |
The database resides on the District1 server in a folder called Grand |
What steps must be taken independent of the computer system (Manual
Process) |
|
Which steps must be taken on a computer (Electronic Process): |
Most of the time the problem is taken care by remapping the Grand directory on the District1 server to G:
If that does not work, an install of the work station has to be done over again. The install files are located in the Grand directory on the District1 server. |
Related Documents to Process (e.g. Datatel documentation, Government code books, etc.) |
|
Notes (Cautions, suggestions for improvement, etc.) |
|