Process Number: 91 |
Revision Date: 11/7/2001 3:32:00 PM |
Revision #: 4 |
Datatel Patch Load Process
Office Responsible: | DCS - District - Computing Services | Process Type: | internal |
Position Title: | Datatel System Administrator | Author: | Technical Director | ||
Cross Trained Staff: | BNoble | Manager: | DHarris | Vice Pres.: | RTemple |
Timeline (Deadlines or Time-Constraints) : |
Monthly/After-hours/No Users on System |
What must be done before this process is started: |
ExpressLoad Preparation/Pre-Load processes. |
Which processes are waiting for this process: |
Source documents or communication with information needed for this process: |
What is the end-result of this process, or the hand-off |
Patches applied to the appropriate Datatel software account. (LIVE, TEST, DEV) |
What steps must be taken independent of the computer system (Manual Process) |
Which steps must be taken on a computer (Electronic Process): |
ExpressLoad Supercedes the old SOS process. Datatel no longer supports the SOS install process. See the Datatel ExpressLoad Manual for guidance. Old process: 1. Create a savelist in collive of the patches in the sos directory to be loaded in the desired order of execution. 2. Run PATCH.SETUP in collive. Enter savelist name and COLL. 3. Exit to Unix and cd to /datatel/release/sos. 4. Do chmod 770 extract.sos. 5. Execute the extract.sos script. 6. Go to /datatel/release/COLL16/INSTALL. 7. udt 8. Execute SOS.COPY.INSTALL 9. Execute SOS.INSTALL.MAIN |
Related Documents to Process (e.g. Datatel documentation, Government code books, etc.) |
Notes (Cautions, suggestions for improvement, etc.) |
Process Number: 91 |
Revision Date: 11/7/2001 3:32:00 PM |
Revision #: 4 |